Item |
Country |
Type |
Bridge
Length(m) |
Width(m) |
Steel
Weight
(m.t.) |
Completed |
|
Mandaue Opon Bridge |
Philippines |
3-span continuous truss,3-span continuous plate,girder & simple beam |
860.0 |
12.7 |
2,100 |
1970 |
|
Arkansas River Bridge |
U.S.A |
3-span continuous composite girder, 3-and 4-span continuous plate girder |
1,518.5 |
15.5 |
12,000 |
1972 |
|
Maroon Bridge and Others |
Iran |
Composite girder & through truss |
780.0 |
8.5 |
1,900 |
1972 |
|
Basrah-zubair Swing Bridge for Road |
Iraq |
Plate girder |
93.8 |
18.0 |
1,170 |
1978 |
|
Basrah-zubair Swing Bridge for Railway |
Iraq |
Through truss |
74.4 |
9.9 |
930 |
1978 |
|
Panjang-Sribhawono Highway Bridge (South Sumatera) |
Indonesia |
Warren truss |
62.0 |
8.0 |
186 |
1979 |
|
Ci-sadane Bridge |
Indonesia |
6-span composite plate girder |
184.6 |
12.0 |
730 |
1982 |
|
Kuparuk River Crossing Bridge |
U.S.A |
Simple truss (Pipeline) |
|
|
3,170 |
1982 |
|
Columbia River Railway Bridge |
U.S.A |
3-span simple truss |
228.1 |
|
1,260 |
1982 |
|
Jakaruta Merak Road Bridge |
Indonesia |
I Girder |
184.6(6@30) |
12.0 |
374+374 |
1982 |
|
Cipatiku Bridge |
Indonesia |
Warren truss |
103.4(57.7+43.5) |
7.9 |
168 |
1983 |
|
Chibitan Road Bridge |
Indonesia |
Warren truss |
44.4 |
5.5+1.0 |
74 |
1983 |
|
Cilangkap Road Bridge |
Indonesia |
Simple truss |
43+90+43 |
7.9 |
492 |
1983 |
|
Tripa de Gallina Bridge |
Philippines |
Simple truss |
36.38, 49.48 |
|
198 |
1983 |
|
Railway Bridge for Columbia Cerrejon Coal Project |
Columbia |
H-beam girder |
|
|
2,650 |
1983 |
|
Railway Bridge for Indonesia |
Indonesia |
Through Girder, Deck Girder, Open Truss, Through Truss, 25 |
6.5 to 50.0 |
|
534 |
1983 |
|
Chiranan Road Bridge |
Indonesia |
Simple Composite H Girder |
20.0 |
|
27 |
1984 |
|
Taba Bridge |
Indonesia |
Lattice truss (Temporary) |
76.0 |
4.5 |
251 |
1984 |
|
Enim River Bridge |
Indonesia |
4-Span Continuus Composite girder |
180.0(40+40+60+40) |
|
360 |
1984 |
|
Abha-jizan Bridge |
Saudi Arabia |
Continuous plate girder |
230.0 |
12.6 |
1,160 |
1984 |
|
Road Bridge for Feeder Road Project No.29 |
Saudi Arabia |
Composite plate girder |
|
11.6 |
2,030 |
1984 |
|
Flathead River Bridge |
U.S.A |
Simple plate girder |
282.0 |
|
700 |
1985 |
|
Kepong Interchang |
Malaysia |
Composite plate girder |
283.0, 412.6 |
8.4, 11.9 |
2,300 |
1986 |
|
Greater New Orleans No.2 Bridge Approaches |
U.S.A |
Continuous plate girder |
570.0 |
10 to 21 |
2,100 |
1986 |
|
Snohomish River Railway Bridge |
U.S.A |
Plate girder |
38.0, 45.6 |
|
330 |
1988 |
|
Rural Road Bridge (Phase I) |
Philippines |
H-beam girder |
20 to 25 |
8.0 |
450 |
1988 |
|
Rural Road Bridge (Phase II) |
Philippines |
Plate girder & H-beam girder |
24.5 to 107.1 |
7.6 |
1,040 |
1989 |
|
Rural Road Bridge (Phase I) |
Thailand |
Plate girder & H-beam girder |
11 to 23 |
5.6, 8.6 |
340 |
1990 |
|
Copan Bridge |
Honduras |
H-beam girder |
54.0 |
4.0 |
30 |
1990 |
|
Taue Bridge |
Senegal |
Plate girder |
80.0 |
3.5 |
40 |
1990 |
|
Bulsa River Bridge |
Philippines |
H-beam girder |
16 to 171.8 |
|
180 |
1990 |
|
Rural Road Bridge |
Guatemala |
H-beam girder & Plate girder |
40 to 75 |
|
190 |
1990 |
|
Rural Road Bridge |
Thailand |
H-beam girder |
50(15+20+15) |
7.0 |
450 |
1991 |
|
Bridge in Kathmandu Valley |
Nepal |
Plate girder & H-beam girder |
22 to 132.7 |
5.5 to 8.5 |
300 |
1991 |
|
Lungga Bridge |
Solomon lslands |
3-span continuous plate girder |
|
|
290 |
1991 |
|
El Zapote Bridge |
Guatemala |
Truss |
50.0 |
|
120 |
1992 |
|
Rural Road Bridge (Phase III) |
Philippines |
Plate girder & H-beam girder |
15 to 96 |
8.3 |
510 |
1992 |
|
Chongwe Bridge |
Zambia |
PABRIS (Portable Bridge) A-type |
720(3@240) |
4.0 |
110 |
1992 |
|
Kafue Road Bridge |
Zambia |
4-span continuous plate girder |
161.2 |
|
330 |
1993 |
|
Bridge in Kathmandu Valley (Phase II) |
Nepal |
Plate girder & H-beam girder |
22 to 134 |
|
220 |
1993 |
|
Chroy Changwar Bridge |
Cambodia |
Box girder |
265(65+135+65) |
13.0 |
520 |
1993 |
|
Rural Road Bridge (Phase IV) |
Philippines |
H-beam girder & Plate girder |
20.0 |
|
870 |
1993 |
|
Jangsa Bridge |
Bhutan |
H-beam girder |
100.0 |
8.3 |
210 |
1993 |
|
Rural Road Bridge (Phase I) |
Solomon lslands |
Continuous plate girder |
56.0, 72.0 |
6.9 to 10.4 |
170 |
1994 |
|
Rural Road Bridge (Phase II) |
Solomon lslands |
Continuous plate girder & H-beam girder |
20 to 72 |
5.7 to 10.9 |
210 |
1995 |
|
Rural Road Bridge (Phase I) |
Bangladesh |
Truss |
14.6 to 24.3 |
3.4 |
300 |
1995 |
|
Rural Road Bridge (Group II) |
Philippines |
Continuous plate girder & H-beam girder |
20.4 to 93.3 |
7.3 to 8.9 |
310 |
1996 |
|
Rural Road Bridge (Phase II) |
Bangladesh |
Truss |
19.8 to 24.6 |
3.7 |
260 |
1996 |
|
Rural Road Bridge (Group I) |
Philippines |
Plate girder & H-beam girder |
19.4 to 38.6 |
8.9 |
492 |
1996 |
|
Rural Road Bridge (Phase I) |
Vietnam |
Plate girder |
21.5 to 64.5 |
5.5 to 6.5 |
170 |
1996 |
|
Kap Shui Mun Bridge |
Hong Kong |
Cable-stayed, continuous composite & PC Box girder |
750(2@80+430+2@80) |
35.0 |
4,500 (total 9,000) |
1997 |
|
Jawa North Line(Package1) A |
Indonesia |
Construction Girder |
10.5 to 50.0 |
|
449 |
1998 |
|
Jawa North Line(Package1) B |
Indonesia |
Bearings |
|
|
34 |
1999 |
|
Umi Bridge |
Papua New Guinea |
Continuous Plate girder |
160.0 |
9.4 |
402 |
1999 |
|
Jawa North Line(Package1) |
Indonesia |
Plate girder, Truss |
25.0 to 40.0 |
4.7 |
550 |
2000 |
|
Narthupana Bridge |
Sri Lanka |
Arch |
75.0 |
13.0 |
341 |
2000 |
|
PNG Relon Bridge(Additional parts) |
Papua New Guinea |
Continuous I Girder |
50.0 to 144.0 |
4.5 to 7.5 |
9 |
2001 |
|
Portable Steel Bridges For Feeder Roads |
Bangladesh |
Simple Truss |
29.9 to 98.8 |
3.5 |
490 |
2001 |
|
Bridges Along Rural Roads in Northen Luzon |
Pilippines |
Simple I girder |
24.7 to 30.5 |
8.8 |
380 |
2002 |
|
Portable Steel Bridges for Feeder Roads |
Bangladesh |
Truss |
19.8 to 74.1 |
3.5 |
543 |
2002 |
|
Reconstruction of Bridge in Mekong Delta Area |
Vietnam |
Simple I girder & H-Beam girder |
21.1 to 99.2 |
4.5 to 5.5 |
809 |
2002 |
|
Steel Bridges for Roads in Rural Areas |
Bangladesh |
Truss |
14.9 to 24.7 |
3.7 to 8.4 |
252 |
2002 |
|
Reconstruction of Bridge, Phase 1 |
Bhutan |
Truss,Langer |
43.0 to 95.2 |
6.3 to 8.3 |
752 |
2002 |
|
Jawa North Line(Package2) |
Indonesia |
Truss |
|
|
880 |
2003 |
|
Reconstruction of Gampola Bridges and Muwagama Bridge |
Sri Lanka |
Langer |
99.0 |
12.4 |
534 |
2003 |
|
Steel Bridges for Roads in Rural Areas |
Bangladesh |
Truss |
10.0 to 19.8 |
3.7 |
179 |
2003 |
|
The Central Area of Viet Nam Steel Girder Procurement of 15 Bridges(South lot) |
Vietnam |
Simple I girder, H-Beam girder |
30.1 to 72.2 |
4.5 to 5.5 |
626 |
2003 |
|
Jawa Southline WW Truck |
Indonesia |
Truss, I girder |
|
|
1,100 |
2006 |
|
Nihonbashi Repair Work(Chroy Changwar Bridge) |
Cambodia |
Repair |
265.0 |
13.0 |
58 |
2006 |
|
Repair on Existing Maruwai Bridge in Central Kalimantan(1) |
Indonesia |
Repair |
106.0 |
9.5 |
14 |
2006 |
|
Repair on Existing Maruwai Bridge in Central Kalimantan(2) |
Indonesia |
Repair |
106.0 |
9.5 |
10 |
2007 |
|
Repair on Existing Maruwai Bridge in Central Kalimantan(3) |
Indonesia |
Repair |
106.0 |
9.5 |
1 |
2007 |
|
Reconstruction of Bridges, Phase 2 |
Bhutan |
Langer |
180.0 to 283.0 |
5.5 to 6.0 |
742 |
2007 |
|
Ciputat Flyover |
Indonesia |
Simple Box Girder |
102.0 |
19.6 |
589 |
2008 |
|
Portable Steel on Upazila and Union Roadas |
Bangladesh |
Simple Truss |
19.8 to 29.5 |
3.7 to 3.8 |
178 |
2008 |
|
Taiwan National Expressway No6, C606A Viaduct Project |
Taiwan |
Steel Deck Box girder |
838.5 |
27.4 |
3,332 |
2008 |
|
Taiwan National Expressway No6, C606A Viaduct Erection |
Taiwan |
Steel Deck Box girder |
838.5 |
27.4 |
16,704 |
2008 |
|
Incheon Bridge(Cable Buffer & Lease) |
Korea |
Cable-stayed |
1,480.0 |
33.7 |
(28,000) |
2009 |
|
Stonecutters Bridge |
Hong Kong |
Cable-stayed |
1596.0 |
53.3 |
8,633 (total 43,165) |
2009 |
|
Draha Bridge Erectin Work(superintendence) |
Indonesia |
Truss |
45.0 |
6.5 |
(80) |
2009 |
|
Maruwai New Bridge |
Indonesia |
Truss + I Girder |
110(80+30) |
9.0 |
463 |
2010 |
|
Reconstruction of Bridge, Phase 3 |
Bhutan |
Langer, Simple I Girder |
70.0, 45.0 |
6.0 |
251 |
2011 |
|
Hanoi-Ho Chi Minh City Railway Line Bridges Safety Improvement Projects(CP-2) |
Vietnam |
Truss, I Girder |
43.0 to 62.3, 11.9 to 12.8 |
4.8, 1.5 |
3,150 |
2012 |
|
Item |
Country |
Steel Weight(m.t.) |
Completed |
|
Crane girder |
Argentina |
900 |
1958 |
|
Steel Frames for Mixta Iron Works |
Argentina |
2,600 |
1960 |
|
Steel Frames for Peru Hydro-power Plant |
Peru |
50 |
1965 |
|
Steel Frames for Wisma Nusantara Building |
Indonesia |
4,200 |
1966 |
|
Steel Frames for Sa-Le Fertilizer Plant |
Myanmar |
1,200 |
1968 |
|
Steel Frames for Musoshi Mine |
Zaire |
2,500 |
1971 |
|
Steel Frames for Ammonia Plant |
India |
350 |
1971 |
|
Steel Frames for Plaza Hotel |
Hong Kong |
5,500 |
1972 |
|
Steel Frames for Ammonia Plant |
Germany |
3,800 |
1973 |
|
Steel Frames for Ammonia Plant |
Former U.S.S.R. |
3,600 |
1974 |
|
Steel Frames for Synthetic Rubber Plant |
Korea |
2,000 |
1974 |
|
Steel Frames for Urea Plant |
Indonesia |
700 |
1974 |
|
Steel Frames for Ammonia Plant |
China |
4,000 |
1975 |
|
Steel Frames for Air-Cooled T/C of Ammomia Plant |
Former U.S.S.R. |
800 |
1975 |
|
Steel Frames for P.I.C Isfahan Works |
Iran |
4,600 |
1975 |
|
Steel Frames for Luxury Hotel Bahrain |
Bahrain |
3,000 |
1976 |
|
Steel Frames for Integrated Maintenance Shop |
Algeria |
10,000 |
1976 |
|
Steel Frames for I.J.P.C. Olefin Plant |
Iran |
1,800 |
1977 |
|
Steel Frames for Power Station |
Cuba |
760 |
1977 |
|
Steel Frames for Air Coolers |
Saudi Arabia |
720 |
1978 |
|
Steel Frames for the Arab Otsuka Pharmaceutical Factory |
Egypt |
430 |
1978 |
|
Steel Frames for Oil Gas Plant |
Former U.S.S.R. |
2,620 |
1978 |
|
Steel Frames for I.J.P.C. Aromatics Plant |
Iran |
1,120 |
1978 |
|
Steel Frames for Non-process Buildings of F.C.C. & Aromatics Plant |
Germany |
1,020 |
1978 |
|
Steel Frames for Hassi R'mel Gas Recycling Plant MPP-IV |
Algeria |
720 |
1978 |
|
Steel Frames for Work Shop |
Algeria |
4,300 |
1978 |
|
Steel Frames for Desalination Plant |
U.A.E. |
154 |
1978 |
|
Steel Frames for Air Coolers |
Venezuera |
520 |
1978 |
|
Steel Frames for H.H. the Amir's Residence |
Bahrain |
880 |
1979 |
|
Steel Frames for Cracking Heater of Ethylene |
China |
4,900 |
1979 |
|
Crane Girder for China Steel |
Taiwan |
2,790 |
1980 |
|
Steel Frames for F.C.C. & Aromatics Plant |
Germany |
12,460 |
1980 |
|
Structural Steel for Wilshire House |
U.S.A. |
2,700 |
1981 |
|
Structural Steel for Oil Pipe Rack |
Saudi Arabia |
4,790 |
1981 |
|
Steel Frames for Polyvinyl Chloride Plant |
China |
185 |
1981 |
|
Steel Box Column for Dae Han Insurance |
Korea |
1,520 |
1981 |
|
Steel Box Column for Cheung Kong Building |
Hong Kong |
1,600 |
1982 |
|
Arzew Liquefied Petroleum Gas Plant |
Algeria |
2,160 |
1982 |
|
Tower & Steel Frames for Youth Training Center |
Myanmar |
570 |
1986 |
|
Steel Frames for Shenzhen Development Center |
China |
3,650 |
1986 |
|
Structual Steel for C.U.F. Plant |
Bangladesh |
610 |
1986 |
|
Steel Frames for A.V.C. Project |
Indonesia |
210 |
1996 |
|
Kanda Thermal Plant Boiler Support Structure |
China(Fabrication) |
2,000 |
1998 |
|
Bandung Geothermal Plant |
Indonesia |
2,100 |
1998 |
|
Callide Power Plant Project |
Malaysia |
828 |
2000 |
|
Hong Kong Jocky Club Sha Tin Racecourse Parade Ring
Redevelopment Project |
Hong Kong |
|
2004 |
|